|
|
The Petry-Kuhne Company GalleryMemorial Stadium The restoration of Memorial Stadium consisted of concrete, structural steel, and aluminum steel work. The concrete work included demolition, repair and disposal for structural concrete, floor slabs on grade, driveways, walks, and stairs construction. Structural steel work included restoration and new construction. Aluminum steel work included removal and replacement. Restroom and Ancillary Facility construction was also included in this restoration project.
|