Serving the Central Illinois area for nearly a century, Petry Kuhne specializes in commercial, industrial and institutional construction. Our commitment to quality, client service and integrity has positioned us as a leader in the construction industry.

Colwell Systems / Patterson Dental

Champaign, IL

PK was selected to construct this new 150,000 sq. ft. manufacturing, distribution, office/sales facility combing three major operations for Patterson Dental which were previously housed at separate facilities. The project included sophisticated HVAC, high voltage electrical, superflat concrete floors, specialized floor coatings, and high tech office space. Petry-Kuhne's long term commitment and record of delivering project's on time was key to being selected. As one of the few General Contractor's of our size in this region that still self perform a high percentage of the project scope, PK was able to once again utilize this strength to control the project schedule and deliver this project on time. PK self performs: concrete, structural steel, all phases of carpentry, and other General Trades work on projects of all sizes throughout Central Illinois

Project Details

PROJECT COST : $ 12.2M

TAGS : Industrial and Warehouse